Services / 04
Carbon
Measure it properly.Report it honestly.
Renewable supply
Renewable supply is a separate question from price, with a named backing mechanism: REGO certificates, supply direct from a generator, or half-hourly matching. We ask for that in writing before we describe a supply as renewable.
Backed in writing
What we will call renewable
- REGO certificates held against your supply.
- Supply direct from a named generator.
- Half-hourly matching, where the supplier confirms the method.
Not evidence
What we will not call renewable
- A supplier’s overall fuel mix, which is not a statement about your supply.
- A rate, which never tells you whether a contract is green.
What is not a saving
Where you already buy renewable supply, moving to another renewable contract maintains that position rather than reducing your emissions. We will say that rather than present it as a carbon saving.
Measured and estimated
We separate what is measured from what is estimated in every figure we report, and we name the conversion factor set and the reporting year it belongs to.
Read the detail
How to check this
Each claim on this page is answered by something you can read for yourself. Nothing below states a figure; it names the document or register the claim is held against.
Point 01
We hold a Level 1 Letter of Authority only
The authority wording sets out what we may do with your data and states that we cannot sign a contract on your behalf. Read it before you sign it.
Point 02
How we are paid is agreed in writing before you sign
Our margin or management fee is stated in the terms that accompany a recommendation, and nothing is added afterwards.
Point 03
Every figure we quote carries a dated source document
Records state the figure, what it is measured against, the document it is taken from and the date on that document. Records still held anonymous are labelled as such.
Point 04
Consumption figures come from meter and supplier data, not estimates
Where a reading is estimated or missing, the record says so rather than filling the gap.
Point 05
Compliance work is held against the current legislation
Each obligation is recorded with the rule it comes from and the deadline it carries, in an evidence pack an auditor can follow.
