Timing, settings and operating practice
Services / Energy reduction
Energy reduction
Find the waste.Remove it.
Intervention workshop
Test the cause before pricing the answer.
Work starts with the meter record, then confirms the plant or operating pattern behind the load.
Lighting, heating, cooling and ventilation
Generation, storage and larger works
Your decision gate
The figures, assumptions and quotation are shown before anything proceeds. You can use your own contractor.
Read the detail
How to check this
Each claim on this page is answered by something you can read for yourself. Nothing below states a figure; it names the document or register the claim is held against.
Point 01
We hold a Level 1 Letter of Authority only
The authority wording sets out what we may do with your data and states that we cannot sign a contract on your behalf. Read it before you sign it.
Point 02
How we are paid is agreed in writing before you sign
Our margin or management fee is stated in the terms that accompany a recommendation, and nothing is added afterwards.
Point 03
Every figure we quote carries a dated source document
Records state the figure, what it is measured against, the document it is taken from and the date on that document. Records still held anonymous are labelled as such.
Point 04
Consumption figures come from meter and supplier data, not estimates
Where a reading is estimated or missing, the record says so rather than filling the gap.
Point 05
The initial review is carried out at no charge
Send a full recent invoice for each meter and sign the Letter of Authority. We report our findings and the options in writing, including where everything is already in order.
