Energy and utilities management for multi-let offices
In a multi-let building the first question is rarely the rate. It is which meter belongs to whom. Landlord supplies, common parts and tenant sub-meters get mixed together after a re-let or a change of managing agent, so we separate them and record which supply sits behind which demise.
Service charge recovery has to be evidenced. The consumption, the rate and the apportionment all need to trace back to a source, so we keep the working and a tenant query can be answered from the record rather than reconstructed.
Minimum energy efficiency standards, air conditioning inspections and certificate expiry dates attach to the asset, not to the contract. We hold those dates against each building and say which requirement is current law and which is still a proposal.
Day one
What we are usually handed
Meters without an owner
Landlord supplies, common parts and tenant sub-meters get mixed together after a re-let or a change of managing agent. We separate them and record which supply sits behind which demise.
Where we fitWe separate landlord, common part and tenant supplies and record which supply sits behind which demise.
Recovery that has to be evidenced
Service charge recovery needs the consumption, the rate and the apportionment to be traceable. We keep the working so a tenant query can be answered from the record.
Where we fitWe keep the consumption, rate and apportionment working so a tenant query can be answered from the record.
Letting standards and certificates
Minimum energy efficiency standards, TM44 air conditioning inspections and certificate expiry dates attach to the building, not to the contract. We hold the dates against each asset and tell you which are current law and which are proposal.
Where we fitWe hold certificate and inspection dates against each asset and say which are current law and which are proposal.
What we do about it
Map every landlord, common part and tenant supply to the demise it serves.
Validate invoices and apportionment ahead of the service charge year end.
Hold certificate and inspection dates against each asset.
Tender landlord supplies across the portfolio rather than building by building.
Who we work withAsset managers, property managers, service charge accountants and building managers.
Simple steps
How to reduce energy use in offices and multi-let buildings
No cost, this week
Changes to habits and settings.
Check the building management system settings against when people are actually in. Settings drift after clock changes and power cuts.
Leave a gap between heating and cooling set points, so both systems are not running at once in the same space.
Add screens, printers and kitchen equipment to the last person out checklist, and check what stays on at weekends.
Low cost
Small purchases and maintenance.
Start with meeting rooms, toilets and stairwells, which are often lit with nobody there.
Clear metering shows who uses what, so cost is recovered from the right party.
Clean filters and coils let the system deliver the same cooling for less energy. Systems over 12kW also need a TM44 inspection at least every five years.
Plan with the data
Larger decisions, best made from metered data.
Half-hourly data shows what the building uses at night and at weekends. Check it against the plant that should be off.
Let commercial property needs an EPC of at least E under current rules. Hold certificate and lease dates together so improvement work is planned ahead.
Ask for a lower carbon option to be assessed when boilers are near the end of their life, rather than when one has failed.
Before anything is agreed
What happens next
Tell us the sector, the number of sites and what prompted the enquiry. Contract end dates and supply numbers help, but you do not need the full picture to start.
We confirm whether the work matches what we do and whether we have capacity to take it on properly. If it does not, we say so.
If it is suitable, we set out the work, the fee basis and the next steps in writing before any contract is signed.
Every supply contract stays in your name. We operate under a Level 1 Letter of Authority only, which means we cannot sign contracts on your behalf.
Questions we are asked here
Yes. We obtain the supplier and network records for the site, match each supply number to the demise it serves and give you the register, including any supply we cannot yet account for.
The consumption, rate and apportionment are recorded with their source, so each line can be traced back to a meter reading and a signed contract.
We hold the certificate and inspection dates for each asset and set out what the current rules require. Where a change has been announced but not made law, we label it as a proposal.
- Hospitality and hotelsLong operating hours and kitchen and spa plant that make load look peaky.
- Restaurants and food serviceSmall supplies in volume, kitchen plant that runs late and units that change hands.
- Leisure and stadiumsEvent day peaks, pool and pitch plant, and agreed capacity set for the busiest day.
- Retail groupsMany small supplies, frequent site changes and rolling contract end dates.
- Manufacturing and industrialHalf-hourly electricity, agreed capacity and reactive power charges.
- Public sector and educationProcurement rules, term dates in the load shape and reporting obligations.
- Care homes and residential estatesContinuous load, heat networks and metering of individual dwellings.
- Charities and non-profitsTrustee oversight, restricted budgets and the VAT and levy reliefs that apply to charitable premises.
Proof
What we have delivered, and who checks our work.
Each figure below is taken from our evidence record and has a full case study behind it.
Michels and Taylor
£206,000a year saved on procurement
Read the case study: Michels and TaylorBroadening Choices for Older People
£161,000a year saved on gas, about £483,000 across a three-year term
Read the case study: Broadening Choices for Older PeopleRoam
Group rates10 per centlower than the previous brokered prices
Read the case study: Roam
Tell us what you have been handed
Send us the latest full invoice for each meter and sign a Letter of Authority. We will complete a full review and feed back our findings and the available options.





