Energy and utilities management for manufacturing and industry

On an industrial supply a large part of the bill sits outside the unit rate. Agreed capacity, reactive power and availability charges and the hours the plant actually runs all change what a contract costs, so we show commodity and non-commodity charges separately on every offer we present.

Agreed capacity is often set for plant that has since changed. We compare recorded maximum demand against the agreed figure and set out what a change would mean, including the risk of exceeding it.

A load that runs across a night shift or a weekend does not cost the same as a day-time load. We price from the half-hourly data rather than an annual total, and where a metering, generation or storage project is worth costing we scope it and appoint the specialist contractor.

Day one

What we are usually handed

Where the load tends to hide at a manufacturing and industrial site, and where we fit once we see it.
  • Capacity that no longer matches the site

    Agreed capacity is often set for plant that has since changed. We compare recorded maximum demand against the agreed figure and set out what a change would mean, including the risk of exceeding it.

    Where we fitWe compare recorded maximum demand against agreed capacity and set out what a change would mean.

  • Reactive power and availability charges

    These are charged separately from the units consumed and are easy to overlook. We identify them on the invoice and say what drives them at your site.

    Where we fitWe identify these charges on the invoice and say what drives them at your site.

  • Shift patterns priced as an average

    A load that runs across a night shift or a weekend does not cost the same as a day-time load. We price from the half-hourly data rather than an annual total.

    Where we fitWe price from the half-hourly data, so a night shift or weekend load is not averaged away.

What we do about it

  • Compare recorded demand against agreed capacity for every half-hourly meter.

  • Separate commodity from non-commodity charges on each offer we present.

  • Model shift patterns from half-hourly data before going to market.

  • Scope generation, storage and metering projects and appoint the specialist contractor.

Who we work withSite engineers, operations directors, procurement and finance teams.

Simple steps

How to reduce energy use in manufacturing and industrial

Practical steps you can take yourself, from habits that cost nothing to decisions best made with metered data. Pick a stage, then open a step to see why it matters.

No cost, this week

Changes to habits and settings.

  1. Walk the site when production has stopped and listen for leaks. Tag each one and add it to the maintenance list.

  2. List equipment that is left running between shifts and at weekends, and agree what can be switched off safely.

  3. Check the pressure each machine actually requires. Running the system higher makes the compressor work harder.

Before anything is agreed

What happens next

If you send us the details below, we run a short suitability check before anything is agreed.
  1. Tell us the sector, the number of sites and what prompted the enquiry. Contract end dates and supply numbers help, but you do not need the full picture to start.

  2. We confirm whether the work matches what we do and whether we have capacity to take it on properly. If it does not, we say so.

  3. If it is suitable, we set out the work, the fee basis and the next steps in writing before any contract is signed.

  4. Every supply contract stays in your name. We operate under a Level 1 Letter of Authority only, which means we cannot sign contracts on your behalf.

Questions we are asked here

We compare recorded maximum demand across the half-hourly data with the agreed figure on the bill and set out the case for changing it, together with the exceeded capacity risk if it were reduced.

They relate to the power factor of the plant on site rather than the units consumed. We identify the charge on the invoice and say what is driving it at your site before recommending anything.

No. We scope the project, run the tender and appoint a specialist contractor, then hold the contractor to the scope on your behalf.

Proof

What we have delivered, and who checks our work.

Each figure below is taken from our evidence record and has a full case study behind it.

  1. £206,000a year saved on procurement

    Read the case study: Michels and Taylor
  2. £161,000a year saved on gas, about £483,000 across a three-year term

    Read the case study: Broadening Choices for Older People
  3. Group rates10 per centlower than the previous brokered prices

    Read the case study: Roam

Checkable with the issuing body

Tell us what you have been handed

Send us the latest full invoice for each meter and sign a Letter of Authority. We will complete a full review and feed back our findings and the available options.